MENU
Lake-Link Home
LOGIN
Lake-Link
LOG IN

502

8/27/19 @ 11:38 AM
ORIGNAL POST
chelios99
User since 8/27/19

We are heading up to the English River in Ear Falls  in two weeks. Does anyone know how the construction is on 502? 

DISPLAYING 1 TO 5 OF 5 POSTS
FILTER OPTIONS
9/11/19 @ 7:00 AM
port1042
User since 2/11/12

We used 71 through Nestor Falls last week. There is some bridge work with work zone stop lights installed in 2 locations on 71 and 2 more on 17 east of Kenora. The delay was probably less than 5 minutes total. If I remember correctly there were 2 zones north of Sioux Narrows on 71 and another 2 on 17 east of Kenora. Otherwise every is in great shape. A lot better then WI State Highways! Even when its good I don't use 502. I much prefer the Hwy 71 route despite the 30 - 40 extra minutes of driving time to Perrault Falls on 105 north of Vermilion Bay.

9/11/19 @ 6:43 AM
chelios99
User since 8/27/19

Leaving tomorrow any last minute updates?

9/5/19 @ 8:15 AM
chelios99
User since 8/27/19

Well we leave a week from today. Sounds like we should head up thru Nesterfalls- Kenora way. 

8/27/19 @ 7:35 PM
murman
User since 11/4/08

Just came back from Red Lake area on Friday.  Roads are perfectly fine, with little to no construction.  5 Minutes tops of added time.  

DISPLAYING 1 TO 5 OF 5 POSTS
Advertise here
Advertise here
Please take a moment to visit our sponsors. Without them we would not be here.